Construction
The implementation stage has a clear beginning milestone (NTP) that, once reached, is the desire of every stakeholder that it flows quickly and smoothly until the start-up and start of commercial operation. (COD)
​
Engineering
The correct definition of the business model leads to the correct definition of scope and the correct operation and maintenance scheme.
Our engineers are there to ensure that projects will always be designed to suit the promoters and the end user.
Site Preparation
Maintaining an environmental balance during construction is as important as doing so during the long service life of a renewable facility that is estimated to last decades.
An appropriate civil study will ensure perfect performance during any weather event as well as convenient access for service.
Temporarily Facilities
Although proper pre work always simplifies tasks on the construction site, it is always necessary to consider minor work as well as temporary storage, whether in nearby or remote sites.
Logistics
Correct international and domestic coordination considering available transit routes, weights, rights of way, lifting, etc.
It is common for renewable projects (energy or irrigation) to be developed in remote locations with access difficulties.
Installation
After careful planning, it comes the installation and connection work, sometimes it is tedious, sometimes is fascinating.
In any case it alwasys should be perfectly executed. Dates are always a pressure but quality rules. And shorter and reduced commissioning times are the result of precise installation procedures.
Commissioning
Interconnection both internally and with the network, to the complete satisfaction of the end user and the electricity company when the design requires it, are critical steps in the commercial operation start date (COD) of any project.