top of page

2.3 Utility prescreen

Verify availability of interconnection point and tariff

1 hCustomer's Place

Service Description

1 MW, Environmental Engineering Firm, Microgrid, Electrical Interconnection, Generation Asset, Sustainability, Climate Change Resilience Electrical Interconnection: When considering the integration of a geeneration asset into a microgrid, our Energy Engineering Firm focuses on three crucial factors. 1. Distance 2. Available Infraestructure in the utility side 3. Infraestructure Sizes and Ratings. Our deliverable has three parts Part I Establish the interconnection point specification and the upgrades, if they are necessary. Part II Necessary communication infraestructure between the microgrid and the utility. Part III Application steps and associated cost in the utility.


Contact Details

+351 926428941

info@1-mw.com

Porto Metropolitan Area, Portugal


bottom of page